Forum quick links
CO2 sensors in retail spaces
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Agnieszka Rylska on
Should retail spaces in a shopping mall have CO2 sensors? Does anyone know if shops are treated as densely occupied spaces?
Locker rooms
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Agnieszka Rylska on
Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.
access to medical point and massage point
NC-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
We are considering options for innovation credits.
international EPD?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alicja Bieszyńska on
My reinforcing steel supplier, which is a global company, sent me an EPD that is based on the american products (it seems to be downloaded from their US webpage).
pressure drop adjustemnt in the baseline model
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I have two questiones: 1.
Special purpose faucets
Schools-2009 WEc4:Process water use reductionposted by Alicja Bieszyńska on
In the school's kitchen we have one separate faucet for washing the dishes (it's not pre-rinse spray, but for full washing) and one for filling the pots.
no permanent workstations
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by Agnieszka Rylska on
My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.
Petrol contamination
NC-2009 SSc3:Brownfield Redevelopmentposted by Alicja Bieszyńska on
My project site is located next to one of the main arteries of Warsaw. Due to the high trafic the strip adjacent to the road is contaminated with petrol related substances (not much but still).
All open space that is counted toward this credit will be preser
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Agnieszka Rylska on
As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".
hidden price on the invoice
CS-2009 MRc6:Certified Woodposted by Agnieszka Rylska on
In our case, the wooden walls are produced by a German manufacturer who is COC-certified.