Forum quick links
Sinks in doctor's consulting room
CS-2009 WEp1:Water Use Reductionposted by Agnieszka Rylska on
Hi!
Electronic equipment
CI-2009 MRc2:Construction Waste Managementposted by Agnieszka Rylska on
Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the
Parking spaces for trucks
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Alicja Bieszyńska on
My project is a distribution center that serves number of loading trucks every day.
water bills received every 3 months
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Agnieszka Rylska on
Our project receives water bills including water usage every 3 months.
shared waste area
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Agnieszka Rylska on
I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.
anticipated annual total ongoing consumables purchases
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Agnieszka Rylska on
In the Reference Guide on page 254 in Table 1.
Use of C&S Commissioning documentation
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Izabela Kwiecinska on
Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.
Previous coal mine area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Agnieszka Rylska on
Is a site which is located on a teritory of a previous coal mine considered perviously developed?
Exterior covered spaces
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Aneta Firląg on
We want to use paving block as one of the hardscape surfaces.
hidden price on the invoice
CS-2009 MRc6:Certified Woodposted by Agnieszka Rylska on
In our case, the wooden walls are produced by a German manufacturer who is COC-certified.