Forum quick links
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
Bicycle requirement
NC-v4 LTc6:Bicycle facilitiesposted by Veronica Reed on
Hello, we are working on a very small 12 room hotel in a historic landmark building, and were considering moving the project from LEED v2009 to LEED V4, but find some issues with this credit requir
Supermarket in a spead shopping center.
Retail-NC-v2009 MPR3:Must use a reasonable site boundaryposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am leading the LEED NC-Retail 2009, certification of a 5000 m2 supermarket that is inside of a 100.000 m2 shopping mall and has numerous stores, walkways, parking
supplier and products UF
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Carol Muñoz on
To comply with IEQc4.4 credit in LEED NC It has been evaluated local furniture suppliers of MDF, used for new buildings and the most regular composite woord and agrifiber for new buildings. In Peru
Different HVAC system in baseline than proposed design- C&S
CS-2009 EAc1:Optimize energy performanceposted by Ron Dean on
I am doing the energy model for a CS project.
Building Level Water Metering
EBOM-v4 WEp2:Building-level water meteringposted by sebastian castañeda on
I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus.
FSC
EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materialsposted by Maria Rozatti on
We have available in the market toilet paper with FSC label. This criterion can be accepted in this case?
IEQ c4.2 Paints - Laboratory tests according to SCAQMD Rule#1113
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andrea Tayah Esperão Malta de Campos on
In a LEED 2009 CS project in Brazil and a Epoxi Paint was used in a parking garage.
Topics to accomplish this credit
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Hugo Pereira on
Hi all, I've been dealing with a huge problem to achieve this credit.
source of air for mechanical Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu