Forum quick links
commissioning tests
Healthcare-v2009 EAp1:Fundamental commissioning of building energy systemsposted by SAUL HERNANDEZ on
where can i find the tests of every system to be c commissioned?
Appendix G Oversizing
CS-2009 EAc1:Optimize Energy Performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
Baseline system selection
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hello everyone, We are working with a building that has a complicated geometry, and the selection of the baseline system is not that evident.
In the prelimary review
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by jorge calderon on
In the prelimary review comments to achieve this credit we recive the next comment: "Provide supplemental calculations confirming that sufficient shower facilities have been provided to serve all F
Parking space ownership
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?
Path 10
CI-2009 SSc1:Site Selectionposted by Rodrigo Gomez Junco on
We are pursuing SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is, do I need the Tenant Lease Agreement from the CS project in order to document this credit?
Building Footprint
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Alejandro Macias on
For the calculation of the building footprint, if the project is located in a Previously developed area .Which area of the building footprint should I use?
Urinals on residencial
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m working on a dormitory for kids.
SRI Non-roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by MARIA ESTHER LAMADRID on
Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks
Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th