Forum quick links
Meeting room ID+C: CI certification
CI-v4 MPR3:Must comply with project size requirementsposted by Silvia Ruiz on
Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.
Automatic Receptacle Control
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Mena on
Hi, We have a CI project in Mexico City, for the receptacle control we are specifying 50%of private and open offices with a timer.
No exposed soil - how to comply with ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Michael E. Edmonds-Bauer on
We have a small project that consists af an existing one level building that will have an major renovation.
Massage/Sauna/Swimming pool
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.
Minimum Protected area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Roberto Meza on
Hi, I was wondering if there is a minimum percentage for the protected area for SSc5.1 compliance.
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by MARIA ESTHER LAMADRID on
How should i classify an elastomeric butyl rubber sealant- sealant tape used in the metal roof
Credit 7.1 and 7.2
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Alejandro Macias on
I am working on a dormitory Project and it has different buildings (one for the kitchen, one for administration, girls dormitory….).The roof of this buildings are connected with each other, so almo
Requirements for instant water heater with no storage tank
NC-2009 EAp2:Minimum Energy Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.
MERV filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Is there any mandatory filter efficiency requirement (MERV) for projects located in areas with a very high PM2.5 levels? Is it mandatory for ASHRAE 62.1-2010 requirements?
LOW VOC Comply
CI-v4 EQc2:Low emitting materialsposted by Brigitte Solis W on
Hi, I am completing the VOC calculator, but if I put a product with the maximum allowed value it does not comply. For example if they ask for 70 and my product has 70 for v4 is not fulfilling?