Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Automatic Receptacle Control

CI-v4 EAp2:Minimum energy performance
posted by  Gabriela Mena   on 

Hi, We have a CI project in Mexico City, for the receptacle control we are specifying 50%of private and open offices with a timer.

1
Tue Jun 20, 2017, 1:25 pm

No exposed soil - how to comply with ESC?

NC-2009 SSp1:Construction activity pollution prevention
posted by  Michael E. Edmonds-Bauer  on 

We have a small project that consists af an existing one level building that will have an major renovation.

1
Mon Feb 12, 2018, 10:49 am

Massage/Sauna/Swimming pool

NC-2009 IEQc8.2:Daylight and views - views
posted by  LEED Pro Consultant  on 

Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.

1
Tue Feb 10, 2015, 5:54 pm

Minimum Protected area

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Roberto Meza  on 

Hi, I was wondering if there is a minimum percentage for the protected area for SSc5.1 compliance.

1
Fri Nov 27, 2015, 4:13 am

n/a

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  MARIA ESTHER LAMADRID  on 

How should i classify an elastomeric butyl rubber sealant- sealant tape used in the metal roof

1
Wed Feb 3, 2016, 1:32 am

Local food production

Pilot-Credits SSpc82:Local food production
posted by  Lourdes Salinas  on 

What is the best option of water irrigation systems for a small on site food production?

0

Meeting room ID+C: CI certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Silvia Ruiz  on 

Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.

1
Thu Apr 6, 2017, 5:23 pm

LOW VOC Comply

CI-v4 EQc2:Low-emitting materials
posted by  Brigitte Solis W  on 

Hi, I am completing the VOC calculator, but if I put a product with the maximum allowed value it does not comply. For example if they ask for 70 and my product has 70 for v4 is not fulfilling?

1
Sun Aug 27, 2017, 1:34 pm

LEED NC v2009: Innovation Design

NC-2009 MRc2:Construction waste management
posted by  Paola Medina  on 

Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills?

0

Project Mexico

NC-2009 PIf4:Schedule and Overview Documents
posted by  Alejandro Macias  on 

I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .

1
Fri Jan 29, 2016, 8:53 pm