Thermal controls for 50% occupants
CI-v4 EQc5:Thermal comfortposted by Gabriela Mena on
Hi, We have a project in Mexico City, the system is VRF and for the interior spaces we have Fan coil units, approximately 60% of the project area is open office space and it is complicated to pro
Bus parking space
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by jorge calderon on
To achieve ss.
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
Case2 Option 1- Labs
EBOM-2009 EAc1:Optimize Energy Performanceposted by Alicia Villanueva on
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-
Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Tenant submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
SR Natural stone
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the