Commissioning Requirements Off-site

Credit Forums
posted by  Alicia Villanueva  on 

Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.

0

Case2 Option 1- Labs

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Alicia Villanueva  on 

The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-

1
Tue Sep 8, 2015, 12:29 pm

Project Mexico

NC-2009 PIf2:Project Summary Details
posted by  Alejandro Macias  on 

I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .

0

Energy Rater

LEED for Homes (LEED-H) Forum
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, we want to certify a home outside the U.S.

0

BMS

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs.

1
Thu Jan 12, 2017, 11:05 pm

Robotic Parking Garage Ventilation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Gabriela Mena   on 

Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf

1
Wed Apr 19, 2017, 2:10 pm

LEED Form MR 4

NC-2009 MRc4:Recycled Content
posted by  juan pena  on 

The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?

1
Sat Aug 26, 2017, 5:34 pm

Role

LEED for Homes (LEED-H) Forum
posted by  Gustavo De las Heras Izquierdo  on 

Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the

1
Mon Nov 9, 2015, 2:41 pm

Tenant submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Gustavo De las Heras Izquierdo  on 

I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.

1
Mon May 2, 2016, 5:59 pm

SR Natural stone

NC-v4 SSc5:Heat island reduction
posted by  Juan Carlos Contreras  on 

Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.

1
Tue Jul 19, 2016, 7:29 pm