Forum quick links
LEED 2009 Core and Shell - Kitchen equipments modelling
CS-2009 EAp2:Minimum Energy Performanceposted by Jerzy Wójcik on
Dear Marcus I am writting to enquire about kitchen plugloads in CS. In one of our CS project client wants to include restaurant and kitchen.
Green cleaning
CI-v4 INc1:Innovationposted by JW+A Sp. z o.o. on
Hello,
I wanted to register the following pilot credit: "Safety first: Cleaning and disinfecting your space".
Connection with WELL
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by John Bello on
I think a good option for this credit would be to include a section where affiliated WELL credits can be referenced and merited accordingly.
Partial use of Plant equipment for LEED certification
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
Green Power contract engagement question
NC-v4 EAc7:Green power and carbon offsetsposted by Norbert Harmathy on
Hello,
We want to apply for the Green Power and Carbon Offset credits under LEED v4 BD+C New Construction & Major renovation project.
Should archaeological works, taking place before construction start, be included in ESC Plan?
NC-v4 SSp1:Construction activity pollution preventionposted by Agata Mozer on
Dear All,
Stairwell Lighting zone
NC-v4 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
According to ASHRAE 90.1, section 9.4.1.6 „g.
Calculation Rainwater Amount V4 vs V2009
NC-v4 SSc4:Rainwater managementposted by Anna Korinkova on
Hello everyone,
Certification system for the Baseline project
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
The energy source of the project we are modeling is electricity only.
Letter
CI-v4.1 IPc1:Integrative Processposted by Aleksandra Suchomska on
Hi,
my team is doing the integrative process letter for the first time. How long should it be? How detailed should be the description of each analyzed area?