Forum quick links
Is it forbidden by the LEED to have à Infrared Taps / sensor taps/automatic Taps
NC-v4 WEp2:Indoor water use reductionposted by Sara BENLOUBA on
Hello,
Could you told me if it is forbidden by the LEED standard to put an infrared tap in the toilet?
Thanks,
Steel- Default of 25% post-consumer content
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Jutta Berns on
If someone could please confirm whether the following guidance from the LEED v4 Reference Guide is still applicable to LEED v4.1 projects: "Default recycled content for steel products where no
2019 GreenTag Product Health Declaration (PhD)
EBOM-v4 EQp3:Green cleaning policyposted by Jutta Berns on
I came across a 2019 press release by Global GreenTag advising that the Global GreenTag PhD, Materials Transparency Certification Program is as of 2019 recognised by LEED and USGBC.
Greenfield VS Previously developed site
NC-v4 SSc2:Site development - protect or restore habitatposted by Shlomi Bal on
Hi,
We have a project in Ghana, which is located on a huge site, which is mainly untouched green area, and there is no previous construction on site.
Parking garage ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Lisa Loreti on
The Project Team needs some clarifications about parking garage ventilation. We have three different questions, not linked to each other.
Is EPD obligatory for all curtain wall assembly or just an EPD for glazing count for LEED?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello Everyone,
2012 EPA CGP
CS-v4 SSp1:Construction activity pollution preventionposted by sydney mungala on
anyone have the document
Modeling of Direct Evaporative Cooling System in Baseline
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
I am working on a factory building, of which only the office area (10%) is conditioned using split A/C systems and the factory area (90%) is being cooled by using direct evaporative cooling system.
Can we certify the commercial portion only of a mixed use building (residential & commercial) under LEED BD+C ?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Amgad Khattab on
We have a mixed-use building (residential and commercial) but physically and completely separated by a wall.
Looking for LEED Commissioning Services in Morocco
NC-v4 EAp1:Fundamental commissioning and verificationposted by Gurubasu Katageri on
Hello all,
I am looking for organizations who can offer LEED Commissioning services in Morocco. Can you please suggest, if you have already worked with one ?