Forum quick links
Open-office workstations thermal comfort control
CI-v4 EQc5:Thermal comfortposted by Zsuzsanna Gidro on
Hi!
Campus project - District heating/cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Nikos Tsitsikas on
Hi all,
Alternate approach to collecting e-waste?
NC-v4 MRp1:Storage and collection of recyclablesposted by Renee Shirey on
I have a campus student housing project, thus the electronics in this building would be student-provided. Since collection of e-waste is still required, I am wondering if anybody has been suc
Basic question about Mid-Rise-v4 EQc7 language
Mid-Rise-v4 EQc7:Low-emitting productsposted by Kim Hutchinson on
This is probably an incredibly basic question for this forum, but I have been chasing it around in circles for hours and am hoping someone can give me a definitive answer. I am fairly new to
What counts in terms of "conditioned space"?
Healthcare-v4 SSc7:Places of respiteposted by Garrett Ferguson on
What types of conditioned spaces count towards places of respite? I'm assuming break rooms, waiting rooms, and sim?
LEED NC & Major Renovation, excluding parking garage
NC-v4 MPR2:Must use reasonable LEED boundariesposted by on
Hi,
Average daily visitors calculation
CI-v4 WEp1:Indoor water use reductionposted by Émilie Cormier on
Hi,
Extraction distance to factory and distance from factory to construction site.
NC-2009 MRc5:Regional Materialsposted by cedric grenier on
Hi, I'm having a little bit of trouble understanding exactly what distance they're asking for. It may sound like a bad question but it's an itch I need to scratch.
VOC content evaluation - category definitions and limits vary across the regulations listed
NC-v4.1 EQc2:Low-Emitting Materialsposted by Sagar Raghuwanshi on
LEED v4.1 says that "Product meets the VOC content limits outlined in one of the applicable standards...." and then for paints & coatings, there are 4 standards listed:
LEED AP only during design stage
NC-v4 INc2:LEED Accredited Professionalposted by on
The LEED project I am involved in LEED AP is currently under design stage review and is being constructed.