Forum quick links
AIA Re-occupancy Assessment Tool - Health Canada equivalent?
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Shakir Ismail on
We're working on an office building in Ontario pursuing LEED ID+C and I hoped to present this Pilot credit to our client as a reasonable COVID-19 safety strategy.
Unknown Glazing Performance
CI-v4 EQc7:Daylightposted by Cory Duggin on
We are working on a CI project where the existing glazing performance is unknown. Is there a conservative, default value the GBCI will accept for use in the daylight simulations?
Airport Project Guidance
posted by Petal Joseph on
Hi All,
I'm LEED Project Admin seeking more detailed guidance for v4.1 BD+C airports. Any idea how I get access?
SCAQMD 443.1 VOC content
NC-v4 EQc2:Low emitting materialsposted by Nativa Architecture on
Dear all, We have a product tested with the SCADMQ 443.1 rule with a VOC content of 429 g/l. We consider the product in the category adhesive and sealant, where is required the SCADMQ 1168 rule.
LEED online won't let me upload files
posted by Vera Watts on
hi,
i was wondering if theres another maintanance work on the site as i cannot upload any files. keeps on giving out message saying that theres a technical problem
Annual Energy Use v4 - Homes - Attached - LowRise in CALIFORNIA
Homes-v4 EAc1:Annual energy useposted by Roshni Lad on
Hi everyone,
Campus project with Central Plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.
Demand Response Metering
NC-v4 EAc4:Demand responseposted by Jordan Creveling on
In the case of the Fully Automated Response Event Management, is the Meter that is shown providing feedback to the Utility/ISO/CSP suppose to be the Utility's Meter that comes with the Electrical S
Demand Response Program demands 50 kW reduction
NC-v4 EAc4:Demand responseposted by Edgar Arevalo on
I have a project in New York CIty where the local utility provides a demand response program where the building would participate in peak load reduction for 4 consecutive hours on a day where the u