Forum quick links
Building with no parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by John Riker on
I am working on an existing building in a commercial core. The building has no parking lot, but there is leasable parking spots in the vicinity.
Fundamental commissioning of the base building
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by eileen hughes on
General Contractor is working on the base building, which is required to be LEED CS certified.
Education Program - what if project is private?
NC-2009 IDc1:Innovation in Designposted by Crista Shopis on
The nature of my clients building is private. They would be unwilling to host tours from the public or include too much information on a public website.
De-lamping
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Sunayana Jain on
Can de-lamping be acceptable to meet the Lighting Power Density Requirements?
Combination of Option 1&2
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by V B on
I have seen a similar post to this in 2012 and I was wondering if anyone has since then successfully implemented this strategy by using a combination of fueling stations and preferred parking for f
Regional Priority Credits - Outside US Projects
EBOM-2009 RPc1:Regional Priorityposted by Sundararaj Subburaman on
My project is located in 411045 in Pune, India. It is not listed in the EBOM spreadsheet tab and does not appear using the "Find" function.
Regional points for EAc1 - Optimize Energy Performance
NC-2009 RPc1:Regional Priorityposted by Mariah Grife on
My project has EA c1 listed as a possible Regional Priority credit. This credit allows 1-19 points, does my project apply for a Regional credit if I get even (1) point on EAc1?
RP for Credits with multiple thresholds
NC-2009 RPc1:Regional Priorityposted by Deborah Lucking on
Can a project achieve the Regional Priority point without hitting the higher threshold of a credit?
Reference for the building annual energy cost
CS-2009 EAc2:On-site Renewable Energyposted by Ricardo Sá on
In a Core&Shell project, the percentage of renewable energy integration shall be refered to the total building energy use (including tenants areas) or only to core and shell energy use ?
Ez for projects unable to meet ASHARE 62.1-2007?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hello. Is it necessary to consider the zone air distribution effectiveness (Ez) for projects unable to meet ASHARE 62.1-2007 when calculating 10cfm/person minimum ventilation? Thanks in advance,