Option 3 Under LEED ND V4

ND-v2009 SLLc2:Brownfields redevelopment
posted by  Martine Desbois  on 

Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.

3
Fri Apr 4, 2014, 5:23 pm

Clarification on prescriptive option skylight/floor area ratio

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jason Levine  on 

We are in the process of completing the spreadsheet for credit IEQ 8.1 for a NC project. Kalwall skylights are being used, in addition to Solatube 330 DS daylighting systems.

4
CEO, former USGBC Faculty
Innovative Design, Inc.
LEEDuser Basic Member
8 thumbs up
Fri Apr 4, 2014, 3:53 pm

LEEDBoundary 100%parking bassement Not all levels to be included

LEED Guidance for Campuses and Multiple Buildings
posted by  Gabriela Hernández Castillo  on 

CAMPUS: Two office towers designed to meet LEED Core & Shell with three parking bassement levels, the parking structure occupies the 100% of the site, in addition there is a residential tower t

3
Fri Apr 4, 2014, 12:50 pm

Spaces left for future use should be simulated as conditionned?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Fri Apr 4, 2014, 10:02 am
4
Default Avatar
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
LEEDuser Basic Member
94 thumbs up
Fri Apr 4, 2014, 12:38 am

Audio Visual Equipment part of prerequisite?

CI-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc?

5
Thu Apr 3, 2014, 11:08 pm

LEED baundary

CS-2009 PIf1:Minimum Program Requirements
posted by  gabriel Morales  on 

Our project is located in an area with 3 additional towers (one residential offices and 2), the parking lot of our office tower with LEED certification, has its parking in basements 3, 4 and 5, whi

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 3, 2014, 9:42 pm

Carpet tile approved as acceptable walk-off mat

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

2
Thu Apr 3, 2014, 4:50 pm

Getting "enough" air into little-used corridors

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Rob Watson  on 

I'm working on the certification of a completed project in Russia.

3
CEO
ECON Group
LEEDuser Basic Member
126 thumbs up
Thu Apr 3, 2014, 4:12 pm
3
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Thu Apr 3, 2014, 2:23 pm