Forum quick links
VOC testing method
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Ralph Bicknese on
Does GBCI require a certain testing method for VOC compliance?
Path 2: Storm Water Quantity Control - Discharge into Estuary
CI-2009 SSc1:Site Selectionposted by Gail Williams on
Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo
question about a building at a major port
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
client has a office building (previously developed land) being built along a waterway at a major US port.
Glare Control - Glazing film
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kristina Abrams on
Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?
Documenting Diversion Quantities
NC-2009 MRc2:Construction Waste Managementposted by Jennifer Kissinger on
We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the s
Two Contractors at the same time (LEED NC or C&S)
posted by Rosana Correa on
Commercial C&S building.
Low flow pre rinse spray valve in Europe
posted by Charline SEYTIER on
EUROPE: Pre-rinse spray valve 1.6gpm or lower Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in
One 62MZCalc for each AHU?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Aurelie Simon on
Dear all, We have a 10-storey office building located in Germany with 1 AHU for each floor. Each AHU serves different zones (office, storage, kitchen etc.).
LEED Green Assoc. 2009 exam retake
posted by Nadia Ayala on
Hi Tristan, You mention that "If you fail the LEED v2009 exam and do not schedule a retake before June 15, you will have to take the v4 exam". By scheduling the retake you mean the date in which