CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Charles Nepps on
We received a review comment back, on Energy Modeling report use to document EA cr1.3, that stated the following: "The Proposed design air cooled chiller COP for office is indicated 2.5 does not c
Lighting Power Density-Multiple Bldg Types within one building
NC-2009 EAp2:Minimum Energy Performanceposted by Rebekah Burke on
Our Multipurpose Building is a new NCAA Division II, national broadcast basketball, academic, and exercise center for the campus.
Kitchen Make-up air unit
NC-2009 EAp2:Minimum Energy Performanceposted by Anil Bhari on
Is Make-up air unit considered as process load? Since kitchen has its own cooling and heating system.
Do school buses contribute to the Option 2 rate
Schools-EBOM-v4 LTc1:Alternative transportationposted by R. Ted Krasnesky on
Do school buses contribute as a "ride share" option for students that contribute to the Option 2 alternative transportation rate?
UNDERLAY underneath carpet tiles
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by jack larson on
acceptable entryway systems include permanently installed grates, grills, and slotted systems that allow for cleaning underneath.
Certified LEED CI project going for EBOM
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Michelle Raigosa on
Has anyone with a previously certified LEED CI Silver project (that occupies an entire building with a triple net lease) earn SS Credit 1 under the EBOM rating system (since it was not certified un
location of charging stations
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sahar Abi-Ziki on
We are installing 12 charging stations in the project, and we are wondering where is the preferential spot to install them. 4 will be installed outside to accommodate visitors and the rest inside.
Water category questions
posted by Maria Porter on
Hi Tristan! I dug deeper into the water category yesterday and a few questions surfaced: •Water Metering credit – At least two out of six systems have to be sub metered as applicable to the projec
SSc7.2 Heat Island Effect, Roof
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Francisco Villela on
LEED 2009. NC: I am using the LPE option for SSc7.2. Is it normal for the form NOT to indicate points documented at the bottom when completing the form using the LPE option?
LEED CS & CI built at the same time.
CI-2009 IDc1:Innovation in Designposted by Emmanuel Gee on
Hello, We have a project where the CS and one CI tenant is being built at the same time.