Urgent: Possible to combine TallyCat architectural and structural project files together?
posted by Teresa Jan on
My apologies if I posted this question twice ont he forum - I am a newbie on this forum.
Multi-family Stormwater alternative documentation
NC-v4.1 SSc4:Rainwater Managementposted by Summer Gorder on
Our project is in Seattle with stringent Stormwater requirements.
Zone Secondary Recirculation Fraction
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dave Hubka on
ASHRAE 62.1, Section A1.2.2 states:
Er is less than 1.0 for plenum return systems with secondary recirculation (e.g. fan-powered VAV with plenum return)
Creating Baseline ΗVΑC system selection based on ΑSHRAE 90.1-2010 - Does Ground Floor count as….
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all LEED Users,
Ιn our project the Building (nonresidential – 8.000 m2) consists of following levels:
Bioretention Area Calculation
NC-v4 SSc4:Rainwater managementposted by on
I was wondering about how to calculate the Area of bioretention needed to manage expected runoff on the Reference Guide v4 example.
Baseline System for Data center
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi All, I have read som many answers regarding the baseline system for Data centers, Some are saying use system 8 some are saying use system 3 and 4, which one is the right system?
CSR Sample
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Edgar Arevalo on
I'm reviewing shop drawings for LEED info. The contractor provides a sample of the BPDO calculator filled out with data that is suppose to reflect information from the documents attached
Marsha Maytum Book - Deadline June 23rd
posted by Mary Ann Lazarus on
Hi: Great to see so many of you at AIA COTE Top Ten last week. I'm forwarding the message below for those of you who know Marsha Maytum and can contribute to this important effort.