Forum quick links
Indoor Water Use Reduction calculator - Gender Ratio
NC-v4 WEp2:Indoor water use reductionposted by Caterina Panteghini on
Hi,
did anybody flag "Non default gender mix" in the calculator?
CO2 monitoring for exhaust fan system?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dang Thi on
Our project are factory, the ventilation system use exhaust fans combined with louvre / open door to tranfer outside air direct from outside.
Recycle content for Ready Mix concrete
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Osman Faroq on
Dear LEED users. Hope you are all dowing well.
Greenbuild 2023 Show & Tell!
posted by Amanda Farman on
Hi everyone!
If you will be attending Greenbuild 2023 or live in the DC area, please join us for a Show & Tell!
When: Tuesday September 26, 6:30-9pm ET
LEED for Self Storage Facilities
CS-v4.1 MPR2:Must use reasonable LEED boundariesposted by Levi Jimenez on
We have a Self Storage facility undergoing major renovation that includes the complete demolition and reconstruction of new structures, totaling 5-7 individual structures. The p
Band for UMLHs for vault spaces in a Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi , I am modeling a LEED model for data center, now for vault spaces I am assuming a setpoint of 99 F for cooling and 20 F for heating, what should be band to consider a vault space UMLH?
Option 2, A
NC-v4 EQc6:Interior lightingposted by Simon Lai on
In the open office, I'm providing direct/indirect fluorescent up-light, does it meet the exception of the Option 2A?
Shower column kit with 3 different features and water consumptions.
NC-v4 WEp2:Indoor water use reductionposted by Olga Yuil on
For showers in a new Project a shower column kit will be installed and it includes: a showerhead, a hose and a faucet.
(Example: Kohler Singulier K-72672T-C4-CP)
Recruiting for a Director of Energy Analytics and Informed Design
posted by Bryna Dunn on
Moseley Architects is currently looking to hire a Director of Energy Analytics and Informed Design. This is a fast paced and exciting position at an A/E firm with offices in Maryland, Virgini
Reclaimed water irrigation service metering - can this effectively fulfill quota of (2) minimum water subsystems?
NC-v4 WEc4:Water meteringposted by Joanna Switzer on
Step 2 of the Step-by-Step BD+C Reference guidance notes...."if the team is using reclaimed water for irrigation, 100% of this water must be submetered.