Final review appeal for credit EAc1, new energy model
posted by Veronica Reed on
Hello We just received the final review report and despite being awarded 31 credits in all categories besides Energy and Atmosphere, we were denied certification since our energy modeling and resu
How to define categories
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Noriko Nagazumi on
Hello there, There is a sample summary of energy and metering capacity on page 200 of the reference guide, and some explanation on "Energy Use Breakdown" on page 198 saying that significant appli
Parallel PIU fan energy
NC-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
My baseline is under system 6 in which the parallel PIU fans has to be introduced for each zones.
View perserving automated shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Edwin van Eeckhoven on
Dear All, What is exactly the definition of "automated" with regard to the shades when using option 2 for this credit, and would manually operated electric blinds be compliant when VLT x WFR >
Submitting Construction Phase Credits in Design Review
posted by Matthew Heaton on
When submitting our preliminary design review for a LEED for schools project, we did not submit any Construction Phase Credits. Was this an error?
Fixtures, furniture and equipment
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by LEED Pro Consultant on
Hi, Would kitchen cabinets be considered as FF&E?
Educational Program
Healthcare-v2009 IDc1:Innovation in designposted by Gustavo De las Heras Izquierdo on
Hallo, Can we pursue the "Educational Program" credit under the Innovation n Design category? If so, could anyone provide the credit literature?
Fixture replacement authentication
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Omar Delgado on
If the fixture upgrade will be done in house and will only consist of diaphragm replacement for installed flush valves, how can we authenticate the fixtures if there will be no copies of constructi
Cementious materials as adhesives
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by LEED Pro Consultant on
Up in the Bird's Eye View the following statement is made: "Since most mortars, grouts, and thinsets are largely cementitious, with inherently low VOC content, they will comply under most categori
Possible to rent parking and make them preferred parking?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sofie Absér on
Hi! I am working with a project where there are no parking spaces within the project, but parking owned by the municipality very close to the project.