Forum quick links
Measuring TVOCs
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Rick Alfandre on
Has anyone ever used a device called the Airthings Wave Plus? We want to use it to report CO2 and TVOC numbers, but it reports TVOC's in ppb not ug/m3.
Materials and Resources | Optimized Building Products
posted by Jens Ewert on
Concrete Sustainability Council (CSC) responsible sourcing certification for concrete pertains to sustainable sourcing and manufacturing practices for concrete.
Framed assembly U-value calculation
NC-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
Training on for Running In-House Energy Models
posted by Douglas Flandro on
We have several projects that are small enough that we don't hire consultants to run energy models. I just received permission to do some training so that I can run these models myself.
Question about Innovation: Purchasing - lamps for LEED v4 ID+C
CI-v4 INc1:Innovationposted by Courtney Royal on
I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire base building need to comply or just your LEED commercial interiors project?
Purchasing - Lamps: EXIT signs
NC-v4 INc1:Innovationposted by Edgar Arevalo on
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and
LEED BD+C: New Construction
posted by Andrea Wald on
LEED certification needs to address the topic of artificial turf. Specifically, a prerequisite for LEED certification should be that the design includes no artificial turf.
LEED v5 O&M Existing Buildings public comments
posted by Nadav Malin on
Share your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum.
LEEDv5 O+M Public Comment: Building Enclosure retrofit design
posted by Lyle Axelarris on
I’m very disappointed to STILL see no LEED credit address moisture management in building envelope design. As our industry is adding continuous insulation (for good reasons), there are more a
Case 2 Demand Response Capable Building with a "future" program
NC-v4.1 EAc4:Grid Harmonizationposted by Chris Flint Chatto on
Is case 2 only available to projects with utilities that don't have DR programs? under v4.0, this was clearly the case ("Case 2.