Open-grid paving

NC-2009 WEc1:Water efficient landscaping
posted by  Paula Rantanen  on 

Does anyone know if open-grid paving is qualified as vegetated area?

1
Wed Mar 14, 2012, 3:58 pm

FTEs or Residents for Mixed-use residential project?

Calculating FTEs
posted by  Joel Cesare  on 

Our project is 4 floors: first floor with three commercial tenants and top 3 residential. The occupant numbers for the residential is straight-forward based on LEED default values.

1
Tue Apr 10, 2012, 4:40 pm

Parking in basement

General forums
posted by  Aldo Pazo  on 

Good morning, We are working on a 22 story office project. The building has also 3 stories below grade that mixed parking (250 parking spaces) and other uses (Auditorium, etc.).

1
Thu Feb 21, 2013, 5:14 pm

Concrete Recycling

NC-2009 MRc2:Construction waste management
posted by  matthew convery  on 

Well I've read through the current posts and can't find the following discussed: We have a good amount of clean concrete and CMU we've demolished off an addition, we intend to use as much of the

1
Tue Mar 13, 2012, 8:40 pm

Near Airfield

NC-2009 IDc1:Innovation in design
posted by  David Menk  on 

Our project is located across the street from a military airfield.

1
Fri Apr 6, 2012, 8:09 pm

"Stub-outs" and future development (NPDc6)

General forums
posted by  Eric Orozco  on 

Greetings all, My project is surrounded by adjacent development/redevelopment opportunities - all of which will in time be redeveloped to connect to our street and pedestrian grid, but probably n

1
Tue Mar 13, 2012, 11:37 pm

Increase in Fundamental Scope...

General forums
posted by  Scott Bowman  on 

From my reading of the Fundamental Commissioning credit, it now includes a peer review (but with very little detail) and a Peer Review (Current Facilities Requirements and Operations and Maintenanc

0

Commissioning of Systems not required in prereq

NC-2009 IDc1:Innovation in design
posted by  Shauna Sproul  on 

I am wondering if Innovation & Design Credits can be earned for commissioning systems that are not in the prerequesite, for example the building envelope? I know credits can be earned in 2012 u

1
Wed Mar 14, 2012, 1:32 pm

Density Lighting Exterior

CS-2009 EAp2:Minimum energy performance
posted by  gabriel Morales  on 

Hi, we have any questions about the desnsity lighting exterior: 1.- The building is located on a corner in one of the main streets of Mexico City, the architectural design has 23 terraces which wil

1
Thu Mar 15, 2012, 1:08 pm

Exceptional Calculation for Elevator

NC-2009 EAp2:Minimum energy performance
posted by  Thomas Hellmann  on 

My read on ASHRAE-90.1 and numerous forums, is that USGBC may allow for an exceptional calculation to be performed for elevator energy savings, provided that; 1) Schedule of operation remains the s

1
Wed Mar 14, 2012, 3:56 pm