Forum quick links
applying for the Certification before or after the 10 months
CI-2009 EAc2:Enhanced Commissioningposted by Carolina Vergnano on
My doubt is if it´s possible to Certificate a building with the Operation and Maintenance Manual made by the CxA, or if it´s needed to wait the 10 months required for the Enhanced Commissioning. Wo
LEED CI V2012
CI-2009 IDc2:LEED Accredited Professionalposted by Jaewan Lee on
Dear APs I am curious of LEED CI ID category about Accredited Professional points. If I am LEED AP specialty in BD+C then can I still apply to the AP credit? Or should I have certain certification
Alternative Transportation
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by GOVINDACHARI SUNDARARAJAN on
The alternate transportaion specified 2 Bus Lines with in 1/4 Mile distance from site, it is specifed as 2 lines, kindly confirm that this site should be accesible for 2 different bus routes or sim
Chain of custod?
NC-2009 MRc7:Certified Woodposted by Jennifer Ratts on
i am working on a project where a fabricator (who has a CoC) has used another company to assemble a wood cabimet.
Pesticides and herbicides
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Gustavo De las Heras Izquierdo on
The credit literature states: "Minimize the entry of contaminants into the building from vehicles, pesticides, herbicides, [...]" I wonder if the source of pesticides and herbicides should be con
Self-level Screed Underlayment
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Meghan Ward on
Does anyone know if a screed that is applied to concrete slabs prior to installing carpet tiles is considered for this credit and or IEQc4.1/4.2?
Unoccupied workstation
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Gustavo De las Heras Izquierdo on
In our project there is an open office with 10 workstation but only 6 of them are occupied. Nobody is using the other 4 workstations at the moment.
Conference Room (Multi-Occupant) Light Level Controls
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by shaun Andriano on
In our a project, the engineer designed the conference room with only one lighting fixture.
Design for the Environment Logo for LEED v2009
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by María Fernanda Aguirre on
Hi! Finally here in Chile, we have now available cleaning products certified under EPA's Design for the Environment criteria.
Duct adhesives
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
All HVAC ducts will have an adhesive, some sort of strip, that goes around the duct connections. Does anybody know what will the limit be for this adhesive? Thank you very much.