Forum quick links
System 5. Two boilers
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
In a review, the reviewer told me that as a system type 5, I should model 2 identical boilers.
6.5.3.1 Fan power limitation for a VRF + DOAS system
CI-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi there, should I consider DOAS fan power as part of the total system fan power? The DOAS transports unconditioned outside air to the mixing plenum of the VRF indoor unit. Thanks, Santiago.
Solar Water Heater Savings Calculation
NC-2009 EAc1:Optimize Energy Performanceposted by Jimmy Sparkman on
I need to document, through LEED NC 2009, my energy savings through the use of a solar water heater. I'm not certain if there is a savings estimating spreadsheet out there for use or not.
Electric meters for interior lighting and receptable loads
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Hi, In a Core and Shell model, for EAp2 (eQUEST), a LEED reviewer told me to define lighting and receptable loads meters.
Switching to LEED V4
posted by Ahmed Mosa on
Can we upgrade a registered LEED V3 project to be registered in LEED V4, if yes what are the steps?
Supplemental Calculator for Residential
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lauren Fakhoury on
I'm documenting this credit for an apartment building using the v3 supplemental daylight and views calculator.
Glass manifestation
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Akos Brandecker on
Does anyone know if glass manifestation (decorative films on glass panels) applied on-site falls under any of the IEQ credits and if yes, what requirements it has to meet exactly? Thank you.
Completing Table for MRc4 - MRc7
NC-2009 MRc4:Recycled Contentposted by Nicholas Klever on
I have input all of the information into the form table for these Materials and Resources credits, but the table indicator at the bottom of the table still reads "Incomplete".
Fixture Usage Group
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mike D on
Hi, The project has male and female restrooms with urinals in the male restrooms, as well as unisex restrooms without urinals in the basement and ground levels.