Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

M&V plan for cold and dark shell

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Jatuwat Varodompun  on 

In case the system is yet designed, can CS project get the score in 5.1 and 5.2 by purely using tanant leasing agreement which has the M&V Plan as a reguirement to be responsible by tenants.

1
Tue Mar 25, 2014, 4:18 pm

Breakdown of energy use

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Gustavo De las Heras Izquierdo  on 

It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m

1
Tue Mar 25, 2014, 6:05 pm

Exemplary Performance Compliance

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Eddie Cuevas  on 

I am currently working on a nonresidential project on a college campus that is seeking to obtain an EP point by implementing parking for high-occupancy vehicles.

1
Fri Jul 25, 2014, 5:24 am

LEED Rating System for Food Service Renovation in Dormitory

LEED Rating System Selection
posted by  Cassandra Coffin  on 

What LEED rating system would I use for a food service renovation in an existing dormitory? The building was built in 1927 and has had 6 renovations, the last of which was in 1984.

1
Tue Apr 1, 2014, 12:07 am

developer owned design build project

NC-2009 EAc3:Enhanced Commissioning
posted by  Chris Flint Chatto  on 

We are working on a design-build team developing a project that will be leased to a government agency.

1
Wed Apr 2, 2014, 1:51 pm

Sensor Type Flush Fixtures

CI-2009 WEc1:Water Use Reduction
posted by  Katherine Ann Resurreccion  on 

Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?

1
Wed Mar 26, 2014, 12:31 pm

Not Regularly occupied

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Phillip Cook  on 

In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.

1
Wed Aug 6, 2014, 4:10 pm

Car park in basement

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike D  on 

If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?

0

Late Start

Hospitality-NC-v4 IPc1:Integrative process
posted by  Annie Hwang  on 

We are in the final stages of completing construction documents for a new construction hotel. The owner recently expressed an interest in having the hotel LEED certified.

1
Wed Mar 26, 2014, 6:37 pm

Upgrades

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Andres Giraldo  on 

Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ

1
Wed Mar 26, 2014, 4:36 pm