Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project. Is there any talk of this becoming a standard credit, or possibly a prerequisite?
LEEDuser Basic Member
0 thumbs up
Forum discussion
Pilot-Credits PC60:Integrative Process
Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project. Is there any talk of this becoming a standard credit, or possibly a prerequisite?
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.