Forum quick links
Zones, bay floor area
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Felix Hunziker on
Trying to use Option 2 and I'm confused about Zone Floor Area in the spreadsheet. Isn't the ZFA for sidelighting the same as the bay floor area?
flag lights
Pilot-Credits SSpc7:Light pollution reductionposted by Bill Swanson on
I was just thinking. If this Credit allows us to exclude adversiment lighting and theme park lighting why is it so difficult to exclude flag lighting.
heating load unmet hours
NC-2009 EAc1:Optimize Energy Performanceposted by Razan Nejem on
in the energy modeling result using HAP, the heating load unmet hours turns out to be 2000, however it shouldn't exceed 300 hours, knowing that our system is chilled water not dx units and the Tsta
Drawing the 1/2 Mile Radius for Community Connectivity Credit
NC-2009 SSc2:Development Density and Community Connectivityposted by Joshua Bloom on
I am trying to plot out the 10 community connectivity locations using either google maps or bing maps, and I am unable to draw a 1/2 mile radius circle to enclose the area.
acrylic textured coating
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Dario Ibarguengoitia on
How would I clasify an acrylic textured coating? Thank you very much!!!!
EAC1 Credit Information
NC-2009 EAc1:Optimize Energy Performanceposted by Sari Kujawa on
Under the credit information website with "Credits, Credit Details, Points, Thresholds" listed. The Path is noted as "12% new/8% existing (1 pt) while our template form notes 10 points documented.
ASHRAE 90.1 APPENDIX G Existing Building Model including shading
CS-2009 EAp2:Minimum Energy Performanceposted by Fabiano Castro on
We are modelling a Major Renovation Project under the ASHRAE 90.1-2007 - APPENDIX G.
Submit in Design review but include manuf. cuts in Const Review
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Renee Shirey on
The prereq requires manufacturer cut sheets for the accoustic materials.