Forum quick links
an update from February 2011
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Seonhee Kim on
This is the updated portion of IEQ c5. In mechanically ventilated buildings, each ventilations systems that supplies outdoor air shall comply with the following: o Particle filters or air cleanin
System status report for ventilation system
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Sundararaj Subburaman on
We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system.
SSc6.1 Pond with Flow Restrictor and Total Stormwater Volume
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Sandra Bauder on
I am having the same issue as Lucy (October 18, 2010) on one of our current projects, and the comments by Gregory and Jennifer were helpful but I still have some questions. Scenario: -existing impe
EAp2- Energy Modelling and Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, I am working on a project (Stadium) where the only significative improvement on energy performance is lighting because the COP of the HVAC is basically the same and the envelope is not much
NC or CS
posted by Magnus Stagnäs on
Our client (who is also the building owner) is performing a major renovation of an existing office building.
Educational program
NC-2009 IDc1:Innovation in Designposted by Veronika Sundberg on
We want to go for the two Green Education strategies, signage program and education. Is it enough to educate the staff on a regular basis as a goal for the educational program?
EAp2-Natural Ventilation v/s No HVAC
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
I am trying to determine if a project of an Industry ( "New Construction") without HVAC system get some special credit or if it is possible to obtain the 10% improvement between Baseline and Propos