Sample of Measurement and Verification report for Option B?

NC-2009 EAc5:Measurement and Verification
posted by  Eric JS   on 

Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Tue Mar 20, 2012, 7:04 pm

Core Performance Guide Requirements for Efficiency

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Erik Dyrr  on 

To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 20, 2012, 6:17 pm

Energy simulation

CI-2009 EAp2:Minimum Energy Performance
posted by  Pongthon Junnapat  on 

For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance

5
Tue Mar 20, 2012, 1:28 pm

Exemplary Performance, Option 2, Path 4 (Non-Roof)

CI-2009 SSc1:Site Selection
posted by  Curt Pascoe  on 

This is a follow up to other exemplary performance (EP) discussions that have occurred. I understand that an EP point can be earned under Path 12 of this credit.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Mar 20, 2012, 8:14 am

"Thumbs up" option?

General forums
posted by  Mara Baum  on 

Tristan, I've read several comments that I would agree with and would like to say the same thing, but the original comment is adequate or even better than my own ideas.

6
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Mar 19, 2012, 11:32 pm

Corridors in Dwelling Units

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Dear All, In a residential building with natural ventilation only, should corridors and entry halls in dwelling units be shown to be provided with outdoor air (meaning complying with requirements

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Mar 19, 2012, 10:41 pm

What time does comment period close?

General forums
posted by  Melissa Wrolstad  on 

What time does comment period close? Is it Tuesday at midnight? Thanks- Melissa

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 19, 2012, 8:17 pm

Recycled Content

General forums
posted by  Jessica McNaughton  on 

Am I reading it correctly that the recycled content requirement now includes closed loop recycling process regardless of the amount of any recycled content in the product, so without the closed loo

2
Director of Client Engagement
Natural Capital Partners
LEEDuser Basic Member
42 thumbs up
Mon Mar 19, 2012, 6:12 pm

Basic services within the same shopping center

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Alison Y Rivenburgh  on 

The LEED CI 2009 reference guide states that the project building itself cannot be considered 1 of the 10 basic services; however in a mixed-use building, a maximum of 1 service wtihin the building

2
Mon Mar 19, 2012, 5:48 pm

Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sam Keehn  on 

We are working on a Mosque in Qatar. All visitors to the mosque remove their shoes prior to entering the building. We would like to avoid placing mats at the entrance due to aesthetic reasons.

3
Default Avatar
Environmental and Sustainability Manager
Energy Management Services, Int.
LEEDuser Basic Member
41 thumbs up
Mon Mar 19, 2012, 3:33 pm