Path 2 Flushout
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Amy Harmon on
Our project went with Path 2 Post-occupancy flush out. All AHUs required 2-4 days of flush out before occupancy could occur and about 24 days post occupancy.
n/a
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Anastasia Makarenko on
Dear all, does anybody know if we should consider microbiology laboratory premises as a pollutant source for this credit?
Data Center Modeling - LEED CS version 2009
CS-2009 EAp2:Minimum Energy Performanceposted by Anurag Joshi on
Dear fellow modelers, I have a query regarding modeling and saving percentage calculation for datacenter buildings for LEED CS -2009.
Regional Priority Point
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Kai Starn on
Our project is located in Philadelphia, PA and the project is therefore eligible for a Regional Priority point for SSc5.1 - Protect or Restore Habitat.
Compliance?
Pilot-Credits EQpc78:Design for active occupantsposted by Bernard Dooley on
Could you clarify why a comment on this forum is required even though we have no unresolved questions?
I Have Lost All Patience with LEEDOnline
posted by Caroline O'Leary on
It is absolutely insane the amount of time I (and I'm sure many others) waste working with LEEDOnline. The "quirks and bugs" are entirely too numerous to list.
Alternate Transportation: SSc4.3 and SSc4.4
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greg Snow on
Hi Everyone, I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check.
EAc6 baseline and PP?
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Kasandra Martin on
It says there is to be a baseline year to compare with the performance period. My project is an addition to an existing building that has never been certified.
EAc3 - Enhanced Commissioning, LEED v2009
NC-2009 EAc3:Enhanced Commissioningposted by Jared Reed on
Our project is pursuing EAc3 - Enhanced Commissioning. The reference manual states that the CxA performing the enhanced commissioning must also perform the fundamental commissioning.