Campus PV dedicated - not connected - to building requires Cx?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Joyce Kelly  on 

A portion of a nearby, existing campus PV system has been dedicated - not connected - to our building.

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Fri Jun 24, 2016, 5:34 pm

Solar energy used with previous LEED project credit

NC-2009 EAc2:On-Site Renewable Energy
posted by  Zane Lichtneger  on 

We have a solar farm on our site that generates about 1.7 million kWh of electricity per year. The array is 100% grid tied selling all energy back to the public utility.

3
Default Avatar
Sustainability Analyst
SAS Institute Inc.
LEEDuser Premium Member
5 thumbs up
Fri Jun 24, 2016, 4:11 pm

Timing of ASHRAE Level I & II & BAS System Install

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Marie Kirk  on 

We are going for LEED EBOM v 2009 and need to finish the process by Spring 2017. An engineering firm is getting ready to do an ASHRAE Level I & II audit for us to receive the EA Credit 2.1.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Jun 23, 2016, 5:02 pm

Energy Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Dear All, i am doing a energy simulation for bank building. software have no option LEED Rating V4. It have only LEED 2009 rating system.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 23, 2016, 4:07 pm

survey after 18 mos.

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  PATRICK HILLIER  on 

So we are scraping for a few more points that we lost in our CD review. It is now 18+ mos. after occupancy - can this credit still be obtained?

2
Thu Jun 23, 2016, 3:49 pm

Energy Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Muzamil Rafique  on 

Hi Marcus, I am doing energy modelling for a Bank building. Total Building Area is 55,600 SFT.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 23, 2016, 3:26 pm

"Provide calculations to confirm the quantity......"

NC-2009 WEc1:Water Efficient Landscaping
posted by  Joyce Kelly  on 

We are having difficulty figuring out what the following review comment means. "Provide calculations to confirm the quantity of nonpotable water used for irrigation (52,148.46 gallons in July.) The

2
Thu Jun 23, 2016, 3:03 pm

design vs construction credits

General forums
posted by  Emmanuel Pauwels  on 

I am trying to figure out which are design and which are construction credits in the new LEED online. I also looked at the website.

7
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Jun 23, 2016, 6:33 am

Kitchen

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Sophie Brauer  on 

Hello, I am having a lot of difficulty finding a (European) kitchen that qualifies for this credit.

3
Default Avatar
Architect MAA
Gottlieb Paludan Architects
LEEDuser Basic Member
3 thumbs up
Wed Jun 22, 2016, 3:11 am

Advance notice of not less than 72 hours before pesticide use

EBOM-v4 EQc9:Integrated pest management
posted by  Noriko Nagazumi  on 

Hello. Did the requirement of an advanced notice of not less than 72 hours before a pesticide under normal conditions got erased from EBOM v4?

2
Corporate Regional Quality Assurance Manager / IPM Consultant
Clark Pest Control
LEEDuser Basic Member
1 thumbs up
Tue Jun 21, 2016, 9:23 pm