Campus PV dedicated - not connected - to building requires Cx?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Joyce Kelly on
A portion of a nearby, existing campus PV system has been dedicated - not connected - to our building.
Solar energy used with previous LEED project credit
NC-2009 EAc2:On-Site Renewable Energyposted by Zane Lichtneger on
We have a solar farm on our site that generates about 1.7 million kWh of electricity per year. The array is 100% grid tied selling all energy back to the public utility.
Timing of ASHRAE Level I & II & BAS System Install
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Marie Kirk on
We are going for LEED EBOM v 2009 and need to finish the process by Spring 2017. An engineering firm is getting ready to do an ASHRAE Level I & II audit for us to receive the EA Credit 2.1.
Energy Modeling
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Dear All, i am doing a energy simulation for bank building. software have no option LEED Rating V4. It have only LEED 2009 rating system.
survey after 18 mos.
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by PATRICK HILLIER on
So we are scraping for a few more points that we lost in our CD review. It is now 18+ mos. after occupancy - can this credit still be obtained?
Energy Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Muzamil Rafique on
Hi Marcus, I am doing energy modelling for a Bank building. Total Building Area is 55,600 SFT.
"Provide calculations to confirm the quantity......"
NC-2009 WEc1:Water Efficient Landscapingposted by Joyce Kelly on
We are having difficulty figuring out what the following review comment means. "Provide calculations to confirm the quantity of nonpotable water used for irrigation (52,148.46 gallons in July.) The
design vs construction credits
posted by Emmanuel Pauwels on
I am trying to figure out which are design and which are construction credits in the new LEED online. I also looked at the website.
Kitchen
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sophie Brauer on
Hello, I am having a lot of difficulty finding a (European) kitchen that qualifies for this credit.
Advance notice of not less than 72 hours before pesticide use
EBOM-v4 EQc9:Integrated pest managementposted by Noriko Nagazumi on
Hello. Did the requirement of an advanced notice of not less than 72 hours before a pesticide under normal conditions got erased from EBOM v4?