Recycled content in road underlay material
NC-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?
Re-use of excavated rocks onsite for construction.
NC-2009 MRc2:Construction Waste Managementposted by Palak Varshney on
Project Location: India. The project construction site has rock bed. These rock are excavated, broken and re-used in construction on-site.
IDp1 Health Mission Statement
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kristy M. Walson on
I'm working on my first LEED for Healthcare project and was wondering if anyone out there has a sample Health Mission Statement I can use as a template?
Dedicated Exhaust Clarification
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Alana Spencer on
Hello, Could the exhaust of a high-density copy room be achieved via a 100% exhaust base building system?
LEED Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a project with 2 commercial towers being designed to certify in CS, on the same land owner 2 residential towers (not LEED) are located.
Indoor Water Use Reduction - Impossible to Achieve????
EBOM-v4 WEc2:Indoor water use reductionposted by Meier Corporate Account on
Our dairy was built in 2014 with the most water efficient toilets and sinks on the market. (Urinals use no water).
Div 12 Environmental Info
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Melinda Veregge on
We have a phased project, so it made organizational and tracking sense to use a two-part spreadsheet. Does anyone see any issue with this? Division 12 (only) is coming in at 52% and 54%.
Calculating Work Surface in a Manufacturing Environment
EBOM-v4 EQc4:Interior lightingposted by Meier Corporate Account on
I am trying to fill out the Surface Reflectance tab of the Indoor Lighting spreadsheet. My project is in a 105,000 sq foot manufacturing plant.
Task Lighting
EBOM-v4 EQc4:Interior lightingposted by Katie Raymond on
It appears that typical under cabinet task lighting with just an on/off switch (no midlevel) will no longer satisfy this credit. Am I reading this correctly?
Greenguard
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Melissa Merryweather on
I'm only submitting this request for clarification as a last resort: the contractor says only Greenguard certification is available, but I don't see anything in the thread or the manual commenting