Forum quick links
Third-Party Energy Reporting Innovation Credit
CI-2009 EAc3:Measurement and Verificationposted by Garrett Ferguson on
Does anyone know if the Exemplary Performance option for BD+C given for sharing energy data via a Third-party template is available for ID+C? I haven't seen anything about it either way.
Natural ventilated stairs and lift shaft
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by LEEDme Lorenzi on
Can natural ventilated stairs and lift shaft excluded from requirements of this credit? If not, how can these spaces comply with this credit?
Using Chilled Water Pump similar to ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Wahjudi on
Hi, we have development where the Chiller Plant is serving three buildings.
Reuse of laboratory equipment and furniture
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Isabel Santos on
Dear all, We are assessing a renovation project according to LEED v4.
Non potable water systems
NC-v4 EAc1:Enhanced commissioningposted by Gustavo De las Heras Izquierdo on
Does anyone know if non-potable systems are included in the scope of this credit? I am referring to gray water, stormwater, water treatment plant and irrigation systems. Thanks
GRI Sustainability Reports
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Christine Robbins-Elrod on
It's unclear where GRI-checked reports fall under the credit requirements - would they be considered self-declared for 1/2 value or third-party verified for full value?
Post- industrial Recycled content in Ceramic Tiles
NC-2009 MRc4:Recycled Contentposted by María Fernanda Aguirre on
There is a Company which has sent to us some certificates indicating their ceramic tiles have different percentages of pre-consumer recycled content (depending on the model) according to the next p
Excellent Modeling Guide
NC-2009 EAp2:Minimum Energy Performanceposted by Marcus Sheffer on
In case you have not seen this relatively new guide I would highly recommend it to help with your modeling issues. ANSI/ASHRAE/IES Standard 90.1-2010 Performance Rating Method Reference Manual h
Normalizaiton
EBOM-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas engines and its free
Typical items types for typical office
NC-2009 MRc6:Rapidly Renewable Materialsposted by Jean Marais on
In your experience, which items must be included as rapidly renewable to achieve 2% by cost. Is it, for example, typical to say 1) Floor covering and, 2) Ceiling panels I am struggling to see how