Incomplete spaces for solar panel and future process load

NC-2009 EAp2:Minimum Energy Performance
posted by  Hanh Truong  on 

Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 11, 2017, 2:32 am

Existing Envelop for Baseline case

Schools-NC-v4 EAp2:Minimum energy performance
posted by  John   on 

I am modelling a school building where the new insulation is being added to the existing walls.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Jul 10, 2017, 3:16 pm

62MZ calculator in version 4 LEED

NC-v4 EQp1:Minimum indoor air quality performance
posted by  robert feduik  on 

Has this calculator been changed for use in NC-v4 EQp1 versus the one used in LEED 2009? For new construction, are there any other prerequisites or credits that require the use of this tool in th

4
Mon Jul 10, 2017, 11:38 am

using construction rubble for mine rehabilitation

NC-2009 MRc2:Construction Waste Management
posted by  Jutta Berns  on 

we have a project where the waste management contractor is proposing to use clean construction rubble (non-hazardous rubble, where all recyclable components, eg steel, and hazardous materials have

6
Owner/Architect
Marquis Architecture
LEEDuser Premium Member
7 thumbs up
Sat Jul 8, 2017, 6:04 pm

Multiple AHU's serving one zone

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Lavanya Veerappa  on 

Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Fri Jul 7, 2017, 5:33 pm

Installation of Lighting Posts

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Claire Bannister  on 

We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Jul 6, 2017, 6:58 pm

Energy Model for Ice Rink

NC-v4 EAp2:Minimum energy performance
posted by  Shenhao Li  on 

Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Thu Jul 6, 2017, 1:22 pm

Green Cleaning Plan

NC-2009 IDc1:Innovation in Design
posted by  Gregory Martin  on 

Just received comments back on a project and was surprised at the number of issues with our Green Cleaning Policy. This is a template I have used without any comments/issues in the past.

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Jul 5, 2017, 7:08 pm

100% certified wood

NC-2009 IDc1:Innovation in Design
posted by  Abdulla Anwar  on 

Dears, Our project is aiming for innovation design credit of 100% FSC certified wood, my concern is about does (FSC mixed) certified product contributing to this credit or only the (100% FSC) cert

2
Wed Jul 5, 2017, 7:00 pm

Owns Building

CI-2009 EAc3:Measurement and Verification
posted by  Kristopher Croghan  on 

If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?

4
Wed Jul 5, 2017, 4:57 pm