Forum quick links
Green Cleaning Policy performance period question
EBOM-2009 IEQp3:Green Cleaning Policyposted by Kathy Wislocky on
We are using the full building's green cleaning policy as SScr1 Path 12 "Other Quantifiable Environmental Performance" for our LEED CI project.
Pumps Type
NC-2009 EAp2:Minimum Energy Performanceposted by Saif Abdulameer on
Hello, For app G 90.1 it does not say explicitly if the pump should be constant or variable flow for the primary chilled water pump, the same thing for the condensing water pumps.
Reciprocity b/w ESv3 and LEED MF midrise
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Smita Thomas on
A client needs an energy model for a multifamily midrise that is applying for LEED v4 and also applying for Energy Star.
small community adjustment
NC-v4 LTc5:Access to quality transitposted by nancy picard on
For LEED 2009, there was CIR 431 from the CaGBC that adjusted frequency for communities under 50,000 people. Is there a similar adjustment acceptable for LEED v4?
Is Education still acceptable?
NC-v4 INc1:Innovationposted by Deborah Lucking on
Does anyone have any insight on whether Education is still an acceptable way for a project to achieve an Innovation credit point under LEEDv4? Thanks!
Water Bottle Filling Stations
NC-2009 WEc3:Water Use Reductionposted by Norma Lehman on
do these count in our standard water calculations? if not, can we include them as process water to earn exemplary?
Construction and Demolition Waste Management Plan
NC-v4 MRc5:Construction and demolition waste managementposted by milo valenti on
we are looking for an excel template to do the following! tracking truck picks up C+D takes it to recycling facility!That ticket is expanded into a excel sheet to track what was recycled from that
occupancy sensor in big offices
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.
Option 3 fueling capacity determined by time limit?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Erica Downs on
Our project is at a large university, and a 2-plug Level 2 station has been installed.
End Uses
NC-2009 EAc5:Measurement and Verificationposted by Matthew VanSweden on
I realize that EAc Advanced Energy Metering is not listed in the v4 credits that you are allowed to use on v2009 projects but has anyone had any success utilizing the v4 metering language of "insta