Forum quick links
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
Parametric Rotation Runs for Baseline model of Existing Building
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
Since the energy model is based off of an existing building.
Lavatories in special conditions
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vanessa Montezuma Ramos on
Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.
CBECS energy use intensity
Retail-CI-v2009 EAc5:On-site renewable energyposted by Ricardo Sá on
What is the adequate indicator for estimating the energy use intensity for a supermarket (100% electricity) using the CBECS?
WEc2: Time frame for functional reclaimed water systems
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Brian Bartholomew on
Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys
Pursuing credits in recert that were denied during intial cert
posted by Alexa Stone on
Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.
How much of the area inside the LEED boundary must be included?
NC-2009 WEc1:Water Efficient Landscapingposted by Lawrence Lile on
We have a project where a good part of the non-hardscaped area inside the LEED boundary will be planted in native prairie grasses, with no irrigation.
Regulated vs. Unregulated??
NC-v4 EAc2:Optimize energy performanceposted by Edgar Arevalo on
I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem