Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Acoustic performance: reverberation time

NC-v4 EQc9:Acoustic performance
posted by  alessandro santuari  on 

Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks

1
Tue Sep 26, 2023, 2:25 pm

Airport Terminal LEED certification

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  KONSTANTINOS VAVALETSKOS  on 

In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?

1
Sat Aug 26, 2017, 9:06 pm

Alternative Compliance Path

NC-v4 EAc2:Optimize energy performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th

1
Thu Jun 1, 2017, 6:19 pm

Alternative Compliance Path

CS-2009 EAc1:Optimize Energy Performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the

1
Thu Jun 1, 2017, 6:35 pm

System Type 9 Baseline Fan Sizing

NC-2009 EAp2:Minimum Energy Performance
posted by  Brian Kenney  on 

I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.

1
Fri Jun 2, 2017, 1:48 pm

Bus Line Rerouting for Adjacent Bridge Construction

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Kevin McNulty  on 

Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).

1
Thu Sep 14, 2017, 4:06 pm
1
Tue Aug 29, 2017, 3:12 pm

Nee of a fire suppression system

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Magda Aghababyan  on 

Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo

1
Tue Jun 6, 2017, 1:46 pm

DCV In Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  VEL MUTHU  on 

Hi all, Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires.

1
Fri Jun 2, 2017, 1:08 pm

Operable windows -ground floor or upperfloor?

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Florian Schmidtchen  on 

Dear Sir or Madam, Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows.

1
Mon Aug 14, 2017, 11:59 pm