Forum quick links
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th
Alternative Compliance Path
CS-2009 EAc1:Optimize Energy Performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum Energy Performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Bus Line Rerouting for Adjacent Bridge Construction
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kevin McNulty on
Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).
No Cooling Tower - Alternative Compliance Path
NC-v4 WEc3:Cooling tower water useposted by Kristina Pobre on
My project does not have a cooling tower.
Nee of a fire suppression system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
DCV In Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hi all, Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires.
Operable windows -ground floor or upperfloor?
NC-v4 EQp2:Environmental tobacco smoke controlposted by Florian Schmidtchen on
Dear Sir or Madam, Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows.