greenfield or previously developed site?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Anastasia Makarenko  on 

Dear all, we cannot decide whether we should treat our site as previously developed or as a greenfield site. Hope anyone can help me with this.

0

Basic resource with many uses...

Credit Forums
posted by  Kath Williams  on 

Condensed version of LEED-EB: O&M that has proven to be useful in introducing O&M to potential facilities management clients, those just starting LEED-EBOM, and hopefully, will be a bridge

0

VRP Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Ciaran McCabe  on 

We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees Ce

1
Tue Aug 2, 2016, 7:28 am

Building Area Method - highlighting merchandise

CS-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

For a building I have to use the Building Area Method (ASHRAE 90.1-2007, 9.5.1) because some calculations were already developed through that method and now changing the method would be complicated

1
Wed Jul 27, 2016, 1:49 pm

IEQp1&c2 Documentation

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Jordan Kirrane  on 

Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.

0

Thermal Barrier Tape and EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Jennifer Webb  on 

I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.

1
Wed Jul 27, 2016, 5:46 pm

Using pre-existing conditions as oppposed to existing conditions

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Mei Zhu  on 

SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50

1
Wed Jul 27, 2016, 7:36 pm

Weekly Log

EBOM-v4 WEc4:Water metering
posted by  Kristina Pobre  on 

Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de

1
Fri Jul 29, 2016, 10:19 pm

Epoxy mortar for anchoring rebar in concrete

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Anna Okviana  on 

Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant?

1
Sun Dec 9, 2018, 6:45 am

Sliding Scale

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Kristina Bach  on 

I wish that this Pilot Credit had some sort of sliding scale built-in for the size of the donation.