Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Lighting Sales areas

Retail-CI-v4 EQc6:Interior lighting
posted by  Guillaume PAJOT  on 

Hi, I am working on a store where the sale area is composed of ligthing for furniture and ambiant lighting in ceiling.

1
Tue Sep 5, 2017, 10:14 pm

Baseline Chilled water pumps - G3.1.3.10

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, The standard states that the pump power must be 22 W/gpm. If the project has two chillers and primary secondary circuits, whereby there is on pump per chiller in the primary circuits and

1
Mon May 2, 2016, 3:23 pm

MRc6 Waste Audit - Weight vs. Volume

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Alexis Voeltner  on 

We have always conducted waste audits using weight. We are seeking a more efficient means to calculating waste and recycling; is measuring the volume more efficient?

1
Wed Jul 6, 2016, 4:26 pm

Automatic sliding doors in 90.1-2007 and LEED 3.0 Projects

CS-2009 EAp2:Minimum Energy Performance
posted by  Paul Deinhofer  on 

I am working on project whereat a big retail store wants to use automatic sliding doors for their shop entrances.

1
Wed May 4, 2016, 3:23 pm

Fresh Air & R-Values

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas  on 

Dear All, I want to know that is it mandatory in LEED that we must have a fresh air in each occupied spaces of a project OR we can comply just by providing overall fresh air of the project accordi

1
Tue May 3, 2016, 12:49 pm

v2009 Daylight/Views Calc xlsm - locked

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Howard Tews  on 

In the Views tab, I'm trying to add more rows but when I try to 'Unprotect Sheet' I get a password popup. How do I add rows in Views like I was able to in the Daylight tab?

1
Wed May 4, 2016, 3:07 pm

Laboratories - Appendix G Baseline System

NC-2009 EAp2:Minimum Energy Performance
posted by  Adam Judge  on 

G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur

1
Wed May 4, 2016, 3:27 pm

SSc5.2 Project Boundary

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Christopher Widdowson  on 

If we are using a portion of adjacent Conservation Area to maximize the Open Space via a permanent easement, do we include the easement area within the Project Boundary on all documentation?

1
Tue Jan 17, 2017, 11:46 pm

LTc4- Long-term bicycle storage, Bicycle maintenance program

Retail-CI-v4 LTc4:Bicycle facilities
posted by  Valentin Grimaud  on 

Hi, I am working on a store located on the groung floor of a mall.

1
Wed Jan 18, 2017, 12:53 am

ID+C - EQ Credit Interior Lighting - Lighting Sales areas

Retail-CI-v4 EQc6:Interior lighting
posted by  Valentin Grimaud  on 

HI, I am working on a store with two lighting types: furniture lighting and ambiant lighting. Only a part of the ambiant lighting is controlled depending on daylight illumination (40%).

1
Wed Jan 18, 2017, 6:31 pm