NC-2009 EAc1:Optimize Energy Performanceposted by Muzammal Abbas on
Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce
IEQp1: Minimum Indoor Air Quality Performance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Arslan Faisal on
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.
metal roof sealant
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
Which category does Novaflex metal roof sealant fall into? Thanks
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
Fiberglass Wall Panels - GreenGuard Select Education, Healthcare
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
We have Crane Fiberglass wall panels at janitor closets; I assume they should be included for this credit as a 'wall covering'. The product has certifications for Greenguard Select Education and Gr
Training operating personnel training verirfication
CI-2009 EAc2:Enhanced Commissioningposted by Karina Hanyzewski on
Hi there!, I have a question regarding this requirement for EA Enhanced Cx. The Tenant is pursuing a LEED CI certification in a non-LEED Shell bldg.
LEED CS 2009 SSc4.3 - Option 1 Preferred Parking
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Ruel Galve on
We have a mixed use development project in Jakarta with 6 basements.
Issue with credit 4 calculator EAC4_DYA
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mehdi Kardehi on
Hi All, I am very new to LEED and trying to apply for it for a project we have in hand.
SRI Value for concerete
NC-2009 SSc7.2:Heat Island Effect—Roofposted by soha yamani on
Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part
commissioning vs phasing out construction
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catharina B on
Hello We are working on the project, which include 2 independent buildings: A & B (each 7 stories above grade has own mechanic, energy system and entrances ) and 1 floors underground parking sp