Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Continuous Insulation and Appendix A

NC-2009 EAp2:Minimum Energy Performance
posted by  Paul Diaz  on 

I have wall assemblies with no cavity insulation but 3-4 inches rigid insulation outboard of structural sheathing. The wall is finished by a composite metal panel.

1
Thu Apr 24, 2014, 12:46 am

Louvers for Fresh Air intake

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Nandana Kumar  on 

Hi, For one of the LEED CI project, the developer has provided louvers with motorized dampers in the AHU for fresh air intake. Can the louvers qualify for fresh air intake?

1
Fri Jul 18, 2014, 1:29 am

Must be electricity for FCUs ventilators measured?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Frantisek Macholda  on 

Hello, we have CS office project. The main HVAC systems are central, there are only fan-coils and small local water heaters in tenant spaces.

0

Accessories Included in Baseline.

Healthcare-v2009 WEp1:Water use reduction
posted by  Gabriela Crespo  on 

Dear Forum, I have a question regarding which accessories I should include in the baseline for this credit for a Hospital. Are the faucets located in the surgical prep area included?

1
Mon Jul 21, 2014, 5:30 pm

Healthcare vs NC - Fundamental Commissioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Saju Varghese  on 

Hello, I'm looking into the difference between Healthcare and New Construction Fundamental Commissioning for a project but I have not been able to find anything related to that.

1
Sat Apr 26, 2014, 2:20 pm

"Narrative" in LEEDland

General forums
posted by  Andrew Carman  on 

I am not one of these types who proofread the dinner menu for punctuation and syntax.

1
Thu Apr 24, 2014, 11:39 pm

CI or NC:MR

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Alan Viale  on 

I present a case to confirm the selection of certification must have a project. In a lot of 3900sqf there is a two-storey house with a total area of 4500sqf built on an area which over the years h

1
Tue Jun 17, 2014, 10:02 pm

LEED CI or LEED NC:MR

LEED Rating System Selection
posted by  Alan Viale  on 

I present a case to confirm the selection of certification must have a project. In a lot of 3900sqf there is a two-storey house with a total area of 4500sqf built on an area which over the years h

1
Sat Jul 26, 2014, 5:32 am

Shoe removal and storage space in place of walk off mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats.

0

Employee only restrooms/ no public restrooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Sheela I  on 

In a small retail scenario if there is one unisex restroom intended for employee use only how to you deal with the transient visitors to the space in the PI form?

1
Mon Apr 28, 2014, 5:33 pm