Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

acrylic with non paper backer

Homes-v4 MRp2:Durability management
posted by  Elizabeth Eason  on 

The credit calls for non paper faced backer board behind fiberglass enclosures. Does that apply to behind acrylic surrounds also?

1
Fri Mar 28, 2014, 8:01 pm

Baseline confussion

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Mohamed Hesham  on 

i want to know what is the differences between the ipc baseline calculations ,the LEED EBOM baseline and the performance calculation, in the case i'm dealing with the building fixtures already comp

1
Mon Mar 31, 2014, 3:03 pm

LEED Canada Option 3 Public & Catholic Joint Use School

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Kelly Searle  on 

We are building a joint use school and trying to determine the likelihood of achieving 3 credits under SSc4.1 Alternative Transportation: Public Transportation Access - Option 3 (Transportation Dem

1
Mon Mar 31, 2014, 10:18 pm

Option 3 for Catholic and Public Joint Use School

LEED Canada Forum
posted by  Kelly Searle  on 

We are building a joint use school and trying to determine the likelihood of achieving 3 credits under SSc4.1 Alternative Transportation: Public Transportation Access - Option 3 (Transportation Dem

0

Tables titles missing

ND-v2009 SLLp4:Agricultural land conservation
posted by  Andres Schwarz  on 

On the SSLp4 Credit Language section, the titles of the tables are missing.

1
Thu Apr 3, 2014, 4:02 pm

how long can be interval time between 2 parts of projects

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Catharina B  on 

Hello We are working on the project, which include 3 independent buildings: A, B & C – but for certification is one single building (each 17 stories above grade has own mechanic, energy system

0

Mixed-Use vs. Non-residential Classification for a Hotel

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Francis Porter  on 

Hi, I am working on a hotel which has several buildings, one main building, two different groups of clusters, 2 suite buildings, and a seperate back of house and a seperate employee residences.

1
Fri Jul 25, 2014, 5:26 am

LEED bledge

LEED Rating System Selection
posted by  Osama Hassan  on 

Dear all, we got LEED Gold certification for PNU-Acdemic campus ... so, How long it will take for the Gold pledge to be delivered to the PNU site ?

1
Mon Apr 7, 2014, 4:12 pm

Import products of a company

CI-2009 MRc5:Regional Materials
posted by  Katherine Aroca  on 

I have a question about it, please Can you tell me if the 500 miles are included for import products? I mean, in my company I have products that are import and we distribute that.

1
Mon Mar 31, 2014, 2:22 pm