Forum quick links
LEED NC - Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by sompoche sirichote on
We are working on a project that consists of 2 buildings: office building and workshop building.
Rating System?
NC-2009 PIf2:Project Summary Detailsposted by Racha Rachwan on
I'm working on a project containing one Basement, Ground and a first floor, it is a residential building, its building footprint meets the minimum program requirement.
CO2 in tenant spaces with visual alarm system
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jatuwat Varodompun on
It seems that scop of CS does not require CO2 sensors to be placed in tanent space.
VRP calculations for fan-powered boxes using 62MZ calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by tiantian zhou on
Our system has fan-powered VAV boxes. The first review comments required us to use 62MZ calc to account for local recirculation. But we have 120 AHUs and hundreds of zones.
Late involvement by CxA.
CI-2009 EAc2:Enhanced Commissioningposted by Charles Nepps on
The Owner dragged his feet and did not bring a Commissioning Agent on board until after the construction documents were complete, and construction started.
Hotel key tag system
NC-2009 EAp2:Minimum Energy Performanceposted by Nandana Kumar on
We are working on a hotel project. The guest rooms have a key tag system where the lights and AC switches off as soon as the guest removes the key from the key slot.
LEED Project Boundary for Site Prepped by Previous Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Cassandra Coffin on
I am working on a new residence hall for a college campus and have a couple of questions in regards to the LEED project boundary. Due to multiple scheduling impacts, the site work and deep foundat
M&V plan for cold and dark shell
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Jatuwat Varodompun on
In case the system is yet designed, can CS project get the score in 5.1 and 5.2 by purely using tanant leasing agreement which has the M&V Plan as a reguirement to be responsible by tenants.
Breakdown of energy use
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Gustavo De las Heras Izquierdo on
It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m
Exemplary Performance Compliance
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eddie Cuevas on
I am currently working on a nonresidential project on a college campus that is seeking to obtain an EP point by implementing parking for high-occupancy vehicles.