NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jamison Hill  on 

As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects disc

1
Thu Jan 23, 2014, 10:40 pm

Core and Shell minimum occupancy

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  Vada Kornegay  on 

It seems clear but, to be certain, can a core and shell project have an occupancy of less than 50%?

1
Fri Jan 24, 2014, 4:38 am

Design Preliminary Review - change forms to In-Progress?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Glen Phillips  on 

I have inherited multiple LEED registered projects, and it has been a while since I submitted anything for LEED.

1
Tue Feb 11, 2014, 8:35 pm

What shell I do?

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Taygun Yüksel  on 

Hi there, I would like to ask a question about this credit scope. We have EBOM Coca Cola factory project in Turkey.

1
Mon Jan 27, 2014, 2:26 am

Difference between LO Credit Resources & Credit Library contents

General forums
posted by  RETIRED   on 

Tristan - It would be super if you could ask USGBC staff which is more correct - the Credit Resources in LOv3 or the Resources in the Credit Library?

0

Facade lighting for advertising

CS-2009 EAp2:Minimum Energy Performance
posted by  Lolita Wu  on 

We have a question about facade lighting for a retail project. As the mandatory requirement, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.

1
Mon Jan 27, 2014, 3:22 pm

Typo in the Bird's eye view: 10 fc - not 25 fc?

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Diana Nezamutinova  on 

Isn't the requirement for daylight to have 10 fc, not 25 fc as stated in the EBOM IEQc2.4 Bird's view? Thank you.

0

Tenant switch in a EBOM certified building

CI-2009 PIf5:Previously LEED Certified Details
posted by  Mathilda Jonsson  on 

Hi all My project is LEED EBOM certified since 2010. In summer the current tenant are moving out and a new one will move in.

1
Mon Jan 27, 2014, 3:36 pm

Ceramic tiles vs FloreScore

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Catharina B  on 

Hi I’m a little bit confusing, please correct me. On my LEED CS v2009 ceramic tiles, stone and resin will be installed part of the CS scope of works.

1
Fri May 16, 2014, 7:29 pm

Legacy LEED AP

Healthcare-v4 INc2:LEED Accredited Professional
posted by  Catherine Blakemore  on 

Can folks with Legacy LEED AP status be the LEED AP for projects and fulfill the requirements of this credit?