Forum quick links
Wood Assembly and Regional Materials
NC-2009 MRc5:Regional materialsposted by Denice Staaf on
This is a constant question in the wood industry and I am not sure how to answer it.
AGMBC for LEED-H?
posted by Lauren Sparandara on
Hello, I am working on the possible LEED Certification for a master planned community with around 8,000 units.
Natural Ventilation - Brewery Local Distribution Building
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Summer Gorder on
I am working on a Brewery Campus expansion that includes a small local distribution building that is utilizing natural ventilation.
ASHRAE Standard 90.1 Table G3.2 and occupancy sensors
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Alex AC on
Hi everybody, My team and I are working on a CI project (office floor) where the tenant has installed occupancy sensors for up to 75% of connected lighting load.
Schools-2009 IDc3: The School as a Teaching Tool
Schools-2009 IDc3:The school as a teaching toolposted by Ameet AA on
Could someone please guide me to find credit template/forms for innovation credits?Especially Schools-2009 IDc3: The School as a Teaching Tool As Below link does not give any innovation credits te
Temp Heating
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Andrew Gil on
The Contractor on a project currently under construction has asked a question that I have not yet encountered on the previous (4) LEED-certified projects that I've worked on: He has asked if a "dir
We got comments on our IDc1.1
NC-2009 IDc1:Innovation in designposted by NA AN on
We got comments on our IDc1.1 credit. The advice is to provide documentation to confirm that a project team representative has registered with LEEDuser and participated in the online forum.
Appendix G-Baseline HVAC System
NC-2009 EAp2:Minimum energy performanceposted by Kristin Heinz on
Our project is a bed-and-breakfast with guest rooms that are conditioned using PTHP units. A VRF system conditions the common areas with a DOAS that uses a chiller and hot water boiler.
above 60% relative humidity during flush out
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Benjie Herrera on
Will a a flush out with above 60% relative humidity be acceptable provided there is a valid reason?
Corporate Sustainability for Innovation
CI-2009 IDc1:Innovation in designposted by Kevin Sullivan on
Can corporate sustainability be an innovation credit for LEED , if yes what kind of innovations would they look into.