Forum quick links
Wood costs - per vendor or end user (project contractors)?
NC-2009 MRc7:Certified Woodposted by Victoria Lockhart on
We are having some problems getting the necessary invoices from suppliers to our project contractors, as this reveals the project contractors' price mark up from vendor to client.
LEED NC rating for Non AC buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
I need expert advise on handling non AC building (naturally ventilated) for applying for LEED NC rating system.
Radiant Temperature Measurement
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Sonrisa Lucero on
In the picture on the "Bird's Eye View" page, there is a picture of an infrared thermometer. This would take the temperature of an object.
Including Mezzanines in the Energy Model
NC-2009 EAp2:Minimum Energy Performanceposted by Kellie Hollenbeck on
We are clear that for the total Gross Floor Area we have to include mezzanines.
Elevated Floors. Do they need Floorscore?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Adriana Hansen on
Hi, We have lots of projects that are seeking EQ c4.3 under LEED C&S v3 and they all have elevated floors in the owner scope. In Brazil, we have 3 kinds of elevated floors (by composition): 1.
LEED AP
NC-2009 IDc2:LEED Accredited Professionalposted by TEY SIUNG on
How to upload my LEED AP certificate to earn the point ?
EAp2 - Design and Buildt Contract
NC-2009 EAp2:Minimum Energy Performanceposted by André Knutsson on
Consto have a Design and Buildt Contract with the project owner. The Architects contracts is a part of the contract. His role in the project is design and drawing.
MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?
CI-2009 MRc5:Regional Materialsposted by Simon Sue on
In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us: 1. "Products from _____ vendor...
Clarification
posted by Alexa Stone on
Hi Puteri, Your wording is a little confusing. I think what you are trying to ask is what LEED Rating system would use for a new construction District Cooling Plant?