Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vacancy - EQp1 Calculations

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alice Cook  on 

We have a floor that is vacant in our project building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 2, 2011, 1:23 pm

Measure AHUs or measure air flow in each room?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Michelle Perez  on 

Hello, We are currently working on a LEED EBOM project at our University campus.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Fri Dec 2, 2011, 1:10 pm

Wood Palettes

NC-2009 MRc2:Construction Waste Management
posted by  Samantha De Leuw  on 

On my project, the subcontractors are responsible for reusing wood palettes and, if applicable, selling them back to the manufacturer. Is there a way to record this?

3
LEED AP / Founder
www.BCdesignbuild.com
LEEDuser Premium Member
37 thumbs up
Thu Dec 1, 2011, 9:10 pm

Baseline HVAC system and envelope for hospital patient rooms

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

I'm not sure of the Baseline envelope and HVAC system to use in hospital patient rooms. For one, Section 3.2 defines "residential" as including patient rooms in hospitals.

5
Thu Dec 1, 2011, 6:48 pm
7
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Thu Dec 1, 2011, 6:40 pm

Existing Building undergoing major renovation

NC-2009 EAp2:Minimum Energy Performance
posted by  thomas beal  on 

ASHRAE 90.1 states that existing buildings shall be modeled as is before renovations. Currently the building has all of the window openings boarded up.

3
Wed Nov 30, 2011, 10:32 pm

Garage and technical rooms

CS-2009 IEQp1:Minimum IAQ Performance
posted by  BH .  on 

We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Nov 30, 2011, 9:11 pm

Classification of Use

Pilot-Credits PC15:Parking Reduction
posted by  Roshini Das  on 

Team, I am working on a Dormitory project in a campus housing kids from 1st grade to 8th grade. This project is located in the reservation.

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Wed Nov 30, 2011, 6:17 pm

Metering faucets in shower

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Veronika Sundberg  on 

Hi, our project is considering installing metering in our showers as a water saving improvement.

4
Sustainability Consultant
SLP
LEEDuser Premium Member
97 thumbs up
Wed Nov 30, 2011, 3:26 pm
7
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Tue Nov 29, 2011, 6:38 pm