Vacancy - EQp1 Calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
We have a floor that is vacant in our project building.
Measure AHUs or measure air flow in each room?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Michelle Perez on
Hello, We are currently working on a LEED EBOM project at our University campus.
Wood Palettes
NC-2009 MRc2:Construction Waste Managementposted by Samantha De Leuw on
On my project, the subcontractors are responsible for reusing wood palettes and, if applicable, selling them back to the manufacturer. Is there a way to record this?
Baseline HVAC system and envelope for hospital patient rooms
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Benson on
I'm not sure of the Baseline envelope and HVAC system to use in hospital patient rooms. For one, Section 3.2 defines "residential" as including patient rooms in hospitals.
Existing Building undergoing major renovation
NC-2009 EAp2:Minimum Energy Performanceposted by thomas beal on
ASHRAE 90.1 states that existing buildings shall be modeled as is before renovations. Currently the building has all of the window openings boarded up.
Garage and technical rooms
CS-2009 IEQp1:Minimum IAQ Performanceposted by BH . on
We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?
Classification of Use
Pilot-Credits PC15:Parking Reductionposted by Roshini Das on
Team, I am working on a Dormitory project in a campus housing kids from 1st grade to 8th grade. This project is located in the reservation.
Metering faucets in shower
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Veronika Sundberg on
Hi, our project is considering installing metering in our showers as a water saving improvement.