Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Wed Apr 11, 2012, 12:57 pm

Pre Development Determination

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jennifer Preston  on 

Our site was recently demolished, filled with dirt and left for some time.

3
Tue Apr 10, 2012, 11:22 pm

FSC wood, but not FSC shop. Buy FSC anyway?

CI-2009 MRc7:Certified Wood
posted by  Valerie Molinski  on 

We are pursuing MRc7 on a project that I am working on, but the millwork shop does not have a COC certification.

5
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Tue Apr 10, 2012, 10:32 pm

MRp1: Storage and Collection of Recyclables

General forums
posted by  Sundararaj Subburaman  on 

We are currently involved in executing LEED CI rating for a retail customer. The project outlet space is about 15000 sq.ft which includes first and second floor.

3
Associate Vice President
CallisonRTKL
LEEDuser Basic Member
16 thumbs up
Tue Apr 10, 2012, 10:25 pm

30% for all spaces individually or for the total ?

NC-2009 IEQc2:Increased Ventilation
posted by  Emmanuel Pauwels  on 

We have an overall 30% ventilation above ASHRAE, but it is different in each spaces. Some spaces have 10% more and other have over 40% more.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Apr 10, 2012, 8:43 pm

Recycled Content Table Indicator Incomplete

NC-2009 MRc4:Recycled Content
posted by  Michael Esposito  on 

I have filled out all the information based on actual costs for all product materials and at the end of the form there are no documented points and the "table indicator" states "incomplete".

7
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Tue Apr 10, 2012, 6:06 pm

revised student numbers on form 3 not updating on template

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Joseph Bace  on 

students above grade 3 # was corrected on form 3, template student # still shows old #. GBCI says that all associated point templates cells must be filled-in with something or change won't take.

3
Default Avatar
Owner
BACE, LLC
LEEDuser Basic Member
10 thumbs up
Tue Apr 10, 2012, 2:23 pm

exhaust fans in lieu of VAVs?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  rob moylan  on 

We have 4 person meeting rooms that are typically used for less than an hour at a time, yet during our GBCI audit a comment was made that these spaces need to be controlled individually.

2
Default Avatar
Environmental Engineer
Metadesign Architects Pvt. Ltd.
LEEDuser Basic Member
43 thumbs up
Mon Apr 9, 2012, 6:05 pm

LEED EBOM 2009 IEQ p3 form

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Joseph Greene  on 

We are applying for an green cleaning ID credit as part of our CI LEED application, and design review comments requested we submit the above-listed form for credit compliance.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Mon Apr 9, 2012, 4:06 pm

Prefabricated Smoking Room

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Michael Smithing  on 

We are considering locating a prefabricated smoking room on a building terrace (on the top floor of the building).

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Apr 9, 2012, 4:05 pm