Forum quick links
NC & CI MRc5 DIVISION 12 – FURNISHINGS
NC-2009 MRc5:Regional Materialsposted by Ian McCall on
Hello, I am working a LEED NC 2009 & Retail CI historic building MRc5.
Artworks and Antiques
NC-2009 MRc3:Materials Reuseposted by Omar Elrawy on
In a new construction, which is an Office building, does it count reusing signed artworks and antiques that were existing in the old building?
Minimum threshold for projects with new areas and existing areas
CS-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
We have a project which qualifies for CS and can be treated as a single building.
What about furniture?
NC-2009 MRc3:Materials Reuseposted by Nelina Loiselle on
If instead of purchasing new furniture for the new buidling if we re-use the furniture from the old building will that qualify? Assuming we are counting furniture across MR credits.
LEED Forms not Calculating correctly.
Schools-2009 EAp2:Minimum Energy Performanceposted by BEN MONROE on
I'm not sure if this belongs here or in EC1. This is for a LEED-S 2009 renovation project with an addition. We have updated our energy model input based on the initial design review comments.
Low emitting materials for Schools 2009
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by J W on
We have documented 4.1, 4.2, 4.3 and 4.6 by alternative compliance using NC 2009 rules. At the bottom of the form it only shows that I have documented 1 point. Any ideas?
LEED BD+C Question
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Farah A. on
A commercial office building with a footprint of 70,000 square feet has an overall site area of 200,000 square feet.
Precertification Final Decision
posted by Tracy Baker on
We received our Precertification Final Decision for our Core and Shell building. LEED online indicates I can accept or appeal the final decision.
Simulations for EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Keerthi Ratnayake on
Hello Marcus, Can we consider the savings from renewable energy (solar pv) in the energy simulation? We do not have the minimum 10% without renewable energy. KC
Excellent
posted by Kathryn West on
This should result in a better LEED experience. I also wonder who is answering these emails though and what the communication is between the person answering and the LEED reviewers.