Forum quick links
EAp2 Form
CS-2009 EAp2:Minimum Energy Performanceposted by Lily Li on
in EAp2 Form Summary shows "N", but no error information provided, is this Form wrong?
Discrepancy in graywater volume between Engineer & ELED
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maya Karkour on
Dear all, We are consulting for a big retail shopping mall.
Sampling Locations
NC-v4 EQc4:Indoor air quality assessmentposted by Courtenay Griffin on
Recognizing the issues already under discussion regarding the analytical methods and the maximum contaminant levels presented in LEED v4...
Continuous insulation - Interrupted by slab vs truly continuous
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am modeling a masonry building.
Natural Ventilation in a Warehouse
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Diego Pietzsch on
How can a large Warehouse that uses natural ventilation system, but does not meet the requirements of ASHRAE 62.1-2007 section 5.1 be able to pass under the LEED EBOM IEQp1?
100% OA multiple-zone system
NC-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wironen on
Hi, I'm a little confused about a review comment we received. We have rooftop AHUs supplying 100% Outdoor Air to multiple zones equipped with terminal fan coil units.
LEED IEQ Cr5
posted by Peak Longhorn on
Hi, I'm working on a project that consists of a large warehouse, drive-in bays and a narcotics storage. Currently I have separate ventilation and exhaust units for each space.
Mark LEED v4 credit as ready
posted by Charalampos Giannikopoulos on
Does anyone know how a credit/prerequisite can be marked as "ready" in the new LEED Online (v4)?
What does "can include" mean?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aron Weis on
If there is a non-LEED-certifiable building within the LEED project boundary, the project team can include the non-certifying building within the project boundary in ALL relevant submittals that ar
Appendix 4 - Case A
CS-2009 WEp1:Water Use Reductionposted by Sy Shumaker on
We have a CS project with no signed tenants yet. The owner is providing central restrooms and showers for all of tenants in the base CS project.