Water Use Threshold for Credit Eligibility

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Adam Shelly  on 

There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.

2
Tue Dec 11, 2012, 9:50 pm

FSC Mixed vs FSC Recycle on Invoices?

NC-2009 MRc7:Certified Wood
posted by  John Casciato  on 

If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?

4
Default Avatar
Certified Wood Products, Inc
LEEDuser Basic Member
0 thumbs up
Tue Dec 11, 2012, 8:33 pm

LEED for Healthcare on LEEDuser

LEED for Healthcare forum
posted by  Tristan Roberts  on 

Greetings LEED-HC users! LEEDuser is now displaying the credit language for the entire LEED for Healthcare rating sytem on LEEDuser, with forums tied to individual credits.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 11, 2012, 7:46 pm

Does 62MZ calculations needed?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dorilee Torres  on 

I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.

3
Tue Dec 11, 2012, 7:41 pm

FSC assembly requirement for LEED

NC-2009 MRc7:Certified Wood
posted by  Paul Setzer  on 

Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.

3
Tue Dec 11, 2012, 6:09 pm

summary for mechanically ventilated spaces

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  BH .  on 

So briefly (for C&S mechanically ventilated spaces): For densly occupied spaces we need: CO2 monitors and i.e.

6
Tue Dec 11, 2012, 5:41 pm

Process energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

I got the reviewed comment on the process energy. The way I have modelled is try to add the process load to reach 25% minumum energy threshold eventhough such load does not exist.

6
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 11, 2012, 4:02 pm

Assessing the new MR credits - MRC4 - material ingredients

General forums
posted by  Tom Lent  on 

This credit signifies a huge step in a positive direction for the building industry.

2
Policy Director
Healthy Building Network
LEEDuser Basic Member
117 thumbs up
Tue Dec 11, 2012, 3:30 pm

Cooling Fuels

CI-2009 EAc3:Measurement and Verification
posted by  Nandana Kumar  on 

Hi, We need a clarification about the cooling fuels. What are cooling fuels referred to? Thank you Nandana

3
Default Avatar
Deputy General Manager
LEAD Consultancy & Engineering Services
LEEDuser Basic Member
6 thumbs up
Tue Dec 11, 2012, 2:23 pm

VAV Fume Hood Velocity in Proposed vs. Baseline Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Ralph Bicknese  on 

We have a University Science Building that will house research and teaching labs with multiple VAV fume hoods in several spaces.

3
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Tue Dec 11, 2012, 2:18 pm