Hello,

In the proposed building simulation, some of the spaces are not yet defined and therefore are being simulated as office spaces with System 3 - PSZ-AC.
Because there is a boiler plant in the building for HVAC & SHW it should be assumed that the heating source for this System 3 - PSZ-AC is obtained from this plant (with higher efficiency than the baseline building reference boiler plant). Correct?

Best regards.