Forum quick links
Team Members Blocked from accessing the Project
posted by Mairead Morrissey on
Hi, I'm not sure if this is the place for this post but I can't find a more relevant one.
fan power calculation
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Gellrich on
Hi everyone, I'm a bit confused about the correct way to calculate BL fan power. The building has 6 stories and therefore 6x System 7 in the BL.
Utility Company Project
NC-2009 EAc6:Green powerposted by Ashonta Langdon on
The project I am working on is for a utility company. Can we pursue this credit if purchasing the green power means the company purchases it from itself?
LEED HC IEQ c2
posted by James Chueh on
Hi all, I have some questions on this credit. 1.
Raised Floor
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Natalie Wong on
Hi, I would like to ask whether a raised floor applies to IEQc4.3? If yes, what criteria does it need to meet? As the product is from Europe, it is hard to find the certificate to proof if it is co
low flow faucets in Spain
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Emmanuel Pauwels on
We are certifying a project in Spain.
Base Building Fixtures
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Norma Lehman on
just to confirm, because I feel like there is conflicting (and a lot of) information being posted...the tenant is fitting out a suite in an EBOM building and only has a breakroom sink in their suit
LEED CI
posted by MARIA GARCIA on
Dear all, Do you know if we can use these alternative compliance paths also for the CI projects?? Thanks a lot!!
EQp1
posted by James Chueh on
I have a small question regarding ASHRAE standard 170-2008.
Does this qualify for joint LEED certification
posted by Steve Khouw on
I have an interesting situation. The project is a greenfield building - manufacturing facility & within the envelop is an office space.