Forum quick links
Water-cooled screw chiller- Minimum Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Arub Vijay on
Hi, I would like to seek expert advice in the following. 1) Can anybody advise if water-cooled screw chillers intended to operate at non-standard conditions (Middle East) must comply with Table 6.
WFR question
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by cecilia uri on
I am working on a project wehre the offices are bout 140 sq ft, the window is 5'x5' and the VLT is .70...
Pursuing EQ3.2 but not EQ3?
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alice Cook on
We have a building that is not pursuing EQ3.1 because they're having trouble getting some tenants who use their own cleaning contractor on board with the building's approach.
LEED Reviewer in disbelief
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by SIG - Sustainability Main Account on
I'd like to share a recent reviewer comment. If we had not already achieved more than 60 points, I would have appealed this ruling, but it's not worth my time at this point.
IdeaPaint and other "process" paints
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Harvard University Green Building Services on
I'm working on a project that is considering using Glidden's IdeaPaint product that is a paint that turns any surface into a dry-erase board.
What to include?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mathilda Jonsson on
Hi I'm confused about which floors and carpets should be included for this credit. The developer of the project is renting out all spaces to tenants (hotel and offices).
Troubles filling the template
CS-2009 WEp1:Water Use Reductionposted by Stéphane Paris on
Hi, I'm working on a urban office building and have some troubles filling the template: - We will have automatic sensor for lavatories: how can I take it in consideration?
Related to 62Mz Calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
On the requirements of this prerequisite it says " Each air-handler must be measured; sampling or grouping of air-handlers is prohibited"; If I have three AHU's working for the same zone how can I
ID Credits 5 points
CS-2009 IDc1:Innovation in Designposted by Mike D on
Can the 3 paths be used in combination in order to achieve 5 points? I was wondering if it is possible to achieve 3 points under exemplary performance and then attempt 1 point for a pilot credit a
Hotel occupancy rate and a/c energy consumption
NC-2009 EAp2:Minimum Energy Performanceposted by Orlin Velinov, PE on
We have a hotel project with VRF systems serving the guest rooms. I am struggling with coming up with a way to simulate less than 100% occupancy rate in the hotel guest rooms.