Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Simulation approach strategy.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  TOMAS URIBE  on 

Hello Marcus. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.

1
Tue Dec 31, 2013, 4:38 pm

Minimum occupancy requirements for projects pursuing LEED NC

LEED Rating System Selection
posted by  Guillermo Hernandez Espinoza  on 

Hi. The project is registered under LEED BD+C: New Construction v2009. Is there any Addenda that perhaps changed what is required for a project pursuing LEED NCv2009 from 50% to 0%? (For such a

1
Fri Dec 20, 2013, 6:37 pm

ASHRAE 90.1-2007 - 6.4.3.1.1 COMPLIANCE CRITERIA

CI-2009 EAp2:Minimum Energy Performance
posted by  RICARDO HERNANDEZ  on 

Does anyone know how stringent is the criteria to achieve compliance with the 6.4.3.1.1 Zone Thermostatic Controls for a Commercial Interiors?

1
Tue Dec 31, 2013, 3:50 pm

Redrawing Project Boundary AFTER Initial Review

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  C.M. G.  on 

Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.

1
Mon Dec 23, 2013, 7:31 pm

Where are the Import Facility Data Templates?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Lewis Hewton  on 

Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?

1
Thu Dec 12, 2013, 11:07 pm

Does new LEED online open now?

General forums
posted by  Jorng-ren Chern  on 

It is Dec. 13 now and I still cannot find the webpage of LEED online V4. Can anyone provide the link? Thanks.

1
Fri Dec 20, 2013, 11:13 pm

Utility tariff - an accepted DR strategy?

Data-Centers-NC-v4 EAc4:Demand response
posted by  H.K.C.B. Heendeniya  on 

Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.

1
Fri Dec 13, 2013, 2:17 pm

Naturally Ventilated Underbuilding Parking Garage and 62.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

62.1 has an exahust requirement for mechanically ventilated Parking garages (Table 6-4), with an exception C - no ventilation required if two or more sides comprise walls that are at least 50% open

0

Tenant submetered water use in CS scope?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jukka Akselin  on 

In our shopping mall CS project the all water fixtures in tenant spaces are controlled by tenants (shops + restaurants) and the owner has no control over the fixtures.

1
Fri Dec 20, 2013, 9:29 pm

Commissioning Agent Qualifications

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rick Alfandre  on 

Qualifications for CxA state they must have documented commissioning authority on at least 2 building projects. Is there any commissioning authority experience outside of LEED CxA experience tha

1
Fri Dec 13, 2013, 5:19 pm